Development Server

View Schedule

or schedule as:
the schedule as:
  2019 - Hugh R. Sharp  
R/V Hugh R Sharp - 2019
Secure - ID #13532    Version #3 - 2/4/2019

Scheduling Contact(s)
Jon Swallow jswallow*%*%*udel^%^%^edu (302) 396-8565

  Notes:   9/07/18 - published as secure
10/08/18 - added Trembanis and Calantoni
  View Summary     Set Default Associated Cruises
Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Jan 2019
Dep:01 Jan 2019
Arr:01 Jan 2019
Unload:01 Jan 2019
 
Lewes, DE, USA
Lewes, DE, USA
 
Home Port/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Standby Days
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: New Year's Day

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:02 Jan 2019
Dep:02 Jan 2019
Arr:25 Jan 2019
Unload:25 Jan 2019
 
Lewes, DE, USA
Lewes, DE, USA
 
Home Port/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Overhaul or Repair
  24/24

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Planned engine overhauls (in home port)

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:26 Jan 2019
Dep:26 Jan 2019
Arr:16 Apr 2019
Unload:16 Apr 2019
 
Lewes, DE, USA
Lewes, DE, USA
 
Available/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Available for Service
  81/81

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Available for Service - unused days will be used for maintenance and outfitting and crew weekends off.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:17 Apr 2019
Dep:19 Apr 2019
Arr:26 Apr 2019
Unload:27 Apr 2019
 
Lewes, DE, USA
Lewes, DE, USA
 
James River/
NA06
NA06
 
 
 
37N/76W
37N/77W
 
  Wayne R. Geyer
  8/11

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
USRS-James River Wayne R. Geyer/WHOI N00014-15-1-2948 11/NAVY-ONR/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:28 Apr 2019
Dep:28 Apr 2019
Arr:28 Apr 2019
Unload:28 Apr 2019
 
Lewes, DE, USA
Lewes, DE, USA
 
Home Port/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Standby Days
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Weekend day in home port

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:29 Apr 2019
Dep:30 Apr 2019
Arr:08 May 2019
Unload:09 May 2019
 
Lewes, DE, USA
Lewes, DE, USA
 
US NJ SHELF/
NA06
NA06
 
 
 
39N/73W
39N/73W
 
  Peter Mignerey
  9/11

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Consensus detection Peter Mignerey/NRL-DC UW747-050 11/NAVY-NRL/F
 
Notes: Funded - direct from NRL unit

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:10 May 2019
Dep:10 May 2019
Arr:10 May 2019
Unload:10 May 2019
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
General Upkeep and Outfitting
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Upkeep and Outfitting day between cruises

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:11 May 2019
Dep:11 May 2019
Arr:12 May 2019
Unload:12 May 2019
 
Lewes, DE, USA
Lewes, DE, USA
 
Home Port/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Standby Days
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Weekend in home port

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:13 May 2019
Dep:13 May 2019
Arr:13 May 2019
Unload:13 May 2019
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
General Upkeep and Outfitting
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Upkeep and Outfitting day between cruises

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:14 May 2019
Dep:16 May 2019
Arr:12 Jun 2019
Unload:12 Jun 2019
 
Lewes, DE, USA
Woods Hole, MA, USA
 
Northeast Atl./
NA06
NA06
 
 
 
42N/66W
37N/76W
 
  Nathan Keith
  28/30

Clearances: Canada(T), NONE(T)

Ancil Facs: Wet Lab Van
 
Project PI/Institution Project # Days/Agency/Status
NEFSC SCallop Survey Nathan Keith/NOAA_NEFSC Not Specified 30/NOAA-NMFS/F
 
Notes: Unload the following morning in WH then begin transit to Lewes. Offload other gear in Lewes 6/15.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:13 Jun 2019
Dep:13 Jun 2019
Arr:14 Jun 2019
Unload:15 Jun 2019
 
Woods Hole, MA, USA
Lewes, DE, USA
 
Mid Atlantic/
NA06
NA06
 
 
 
37N/76W
37N/76W
 
  Nathan Keith
Transit Cruise
  2/3

Clearances: NONE(T)

Ancil Facs: Wet Lab Van
 
Project PI/Institution Project # Days/Agency/Status
NEFSC SCallop Survey Nathan Keith/NOAA_NEFSC Not Specified 3/NOAA-NMFS/F
 
Notes: Unload in WH the morning of 6/13 then transit to Lewes. Offload other gear and clean ship in Lewes 6/15.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:16 May 2019
Dep:16 Jun 2019
Arr:20 Jun 2019
Unload:20 Jun 2019
 
Lewes, DE, USA
Lewes, DE, USA
 
Northeast Atl./
NA06
NA06
 
 
 
42N/66W
37N/76W
 
  Nathan Keith
  5/5

Clearances: Canada(T), NONE(T)

Ancil Facs: Wet Lab Van
 
Project PI/Institution Project # Days/Agency/Status
Not Specified 5/NOAA-NMFS/P
NEFSC SCallop Survey Nathan Keith/NOAA_NEFSC Not Specified 0/NOAA-NMFS/F
 
Notes: Pending extra days for HabCam operations

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:21 Jun 2019
Dep:21 Jun 2019
Arr:21 Jun 2019
Unload:21 Jun 2019
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
General Upkeep and Outfitting
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Upkeep and Outfitting day between cruises

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:22 Jun 2019
Dep:22 Jun 2019
Arr:22 Jun 2019
Unload:22 Jun 2019
 
Lewes, DE, USA
Lewes, DE, USA
 
Home Port/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Standby Days
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Weekend day in home port

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:23 Jun 2019
Dep:24 Jun 2019
Arr:28 Jun 2019
Unload:29 Jun 2019
 
Lewes, DE, USA
Lewes, DE, USA
 
Mid-Atlantic/
NA06
NA06
 
 
 
38N/73W
38N/72W
 
  Arthur Trembanis
  5/7

Clearances: US EEZ(T)

Ancil Facs: AUV Lab Van #1
 
Project PI/Institution Project # Days/Agency/Status
Biosampler Arthur Trembanis/UDEL_CEOE OCE-1235133 7/NSF-OCE-OTIC/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:30 Jun 2019
Dep:01 Jul 2019
Arr:03 Jul 2019
Unload:03 Jul 2019
 
Lewes, DE, USA
Lewes, DE, USA
 
Ocean City, MD/
NA06
NA06
 
 
 
38N/75W
38N/75W
 
  Joe Calantoni
  3/4

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
MP-TEX Joe Calantoni/NRL_SSC Not Specified 4/NAVY-NRL/F
 
Notes: dmob upon return 7/3

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:04 Jul 2019
Dep:04 Jul 2019
Arr:07 Jul 2019
Unload:07 Jul 2019
 
Lewes, DE, USA
Lewes, DE, USA
 
Home Port/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Standby Days
  4/4

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: July 4th. Long weekend with ship alongside unless mission scheduled.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:08 Jul 2019
Dep:08 Jul 2019
Arr:04 Aug 2019
Unload:04 Aug 2019
 
Lewes, DE, USA
Lewes, DE, USA
 
Available/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Available for Service
  28/28

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Available for Service - unused days will be used for maintenance and outfitting and crew weekends off.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:05 Aug 2019
Dep:05 Aug 2019
Arr:07 Aug 2019
Unload:08 Aug 2019
 
Lewes, DE, USA
Lewes, DE, USA
 
Ocean City, MD/
NA06
NA06
 
 
 
38N/75W
38N/75W
 
  Joe Calantoni
  3/4

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
MP-TEX Joe Calantoni/NRL_SSC Not Specified 4/NAVY-NRL/F
 
Notes: mob prior to departure 8/5

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:09 Aug 2019
Dep:09 Aug 2019
Arr:15 Sep 2019
Unload:15 Sep 2019
 
Lewes, DE, USA
Lewes, DE, USA
 
Available/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Available for Service
  38/38

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Available for Service - unused days will be used for maintenance and outfitting and crew weekends off.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:16 Sep 2019
Dep:17 Sep 2019
Arr:18 Sep 2019
Unload:19 Sep 2019
 
Lewes, DE, USA
Lewes, DE, USA
 
home port/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Inspection
  4/4

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: NSF inspection 9/17-18 + 1 day before and after. A request to reschedule can be made to accommodate a science mission during this time frame.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:20 Sep 2019
Dep:20 Sep 2019
Arr:02 Oct 2019
Unload:02 Oct 2019
 
Lewes, DE, USA
Lewes, DE, USA
 
Available/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Available for Service
  13/13

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Available for Service - unused days will be used for maintenance and outfitting and crew weekends off.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:03 Oct 2019
Dep:03 Oct 2019
Arr:06 Oct 2019
Unload:06 Oct 2019
 
Lewes, DE, USA
Lewes, DE, USA
 
Home Port/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Outreach
  4/4

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: University of Delaware "Coast Day" outreach and education event. 5,000+ visitors estimated annually. Ship is open for tours. 3 days prep + Sunday 10/6 event.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:07 Oct 2019
Dep:07 Oct 2019
Arr:10 Oct 2019
Unload:10 Oct 2019
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Coast/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Available for Service
  4/4

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:11 Oct 2019
Dep:12 Oct 2019
Arr:13 Oct 2019
Unload:13 Oct 2019
 
Lewes, DE, USA
Woods Hole, MA, USA
 
mid Atlantic/
NA06
NA06
 
 
 
39N/75W
42N/71W
 
  John A. Collins
Transit Cruise
  2/3

Clearances: NONE(T), US EEZ(T)

Ancil Facs: Other AUV, Other Seismic/OBS Facility, AUV Lab Van #1, General Purpose Lab Van
 
Project PI/Institution Project # Days/Agency/Status
Optical Modem OBS John A. Collins/WHOI 1532035 3/NSF-OCE-MGG/F
 
Notes: Transit Lewes to WH. Load van, crane, fuel and stores 10/11

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:14 Oct 2019
Dep:14 Oct 2019
Arr:18 Oct 2019
Unload:18 Oct 2019
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
Pioneer Array/
NA06
NA06
 
 
 
40N/71W
40N/70W
 
  John A. Collins
  5/5

Clearances: NONE(T), US EEZ(T)

Ancil Facs: Other AUV, Other Seismic/OBS Facility, AUV Lab Van #1, General Purpose Lab Van
 
Project PI/Institution Project # Days/Agency/Status
Optical Modem OBS John A. Collins/WHOI 1532035 5/NSF-OCE-MGG/F
 
Notes: Includes mob in WH 10/14.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:19 Oct 2019
Dep:19 Oct 2019
Arr:20 Oct 2019
Unload:21 Oct 2019
 
Woods Hole, MA, USA
Lewes, DE, USA
 
mid Atlantic/
NA06
NA06
 
 
 
42N/71W
39N/75W
 
  John A. Collins
Transit Cruise
  2/3

Clearances: NONE(T), US EEZ(T)

Ancil Facs: Other AUV, Other Seismic/OBS Facility, AUV Lab Van #1, General Purpose Lab Van
 
Project PI/Institution Project # Days/Agency/Status
Optical Modem OBS John A. Collins/WHOI 1532035 3/NSF-OCE-MGG/F
 
Notes: Begin transit from WH to Lewes when unload in WH complete on 10/19. Unload van and crane etc. in Lewes 10/21.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:22 Oct 2019
Dep:22 Oct 2019
Arr:25 Oct 2019
Unload:25 Oct 2019
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
General Upkeep and Outfitting
  4/4

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Upkeep and Outfitting

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:26 Oct 2019
Dep:26 Oct 2019
Arr:26 Nov 2019
Unload:26 Nov 2019
 
Lewes, DE, USA
Lewes, DE, USA
 
Shipyard TBD/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Overhaul or Repair
  32/32

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Shipyard period TBD. ABS major 5-year cycle. Includes 3 transit days.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:27 Nov 2019
Dep:27 Nov 2019
Arr:27 Nov 2019
Unload:27 Nov 2019
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
General Upkeep and Outfitting
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Upkeep and Outfitting

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:28 Nov 2019
Dep:28 Nov 2019
Arr:01 Dec 2019
Unload:01 Dec 2019
 
Lewes, DE, USA
Lewes, DE, USA
 
Home Port/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Standby Days
  4/4

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Thanksgiving Break

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:02 Dec 2019
Dep:02 Dec 2019
Arr:20 Dec 2019
Unload:20 Dec 2019
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
General Upkeep and Outfitting
  19/19

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Upkeep and Outfitting

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:21 Dec 2019
Dep:21 Dec 2019
Arr:31 Dec 2019
Unload:31 Dec 2019
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Standby Days
  11/11

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Christmas Break
Agency   Funded   Pending   Total
NAVY   30   0   30
NOAA   33   5   38
NSF   18   0   18
Total  81 5 86
<
Day Type   Total
Available for Service   164
Transit Cruise   6
General Upkeep and Outfitting   27
Inspection   4
Standby Days   24
Overhaul or Repair   56
At Sea for Science   66
Outreach   4
Total  351
<
Load/Unload Days   Total
ChargeLoad   8
ChargeUnload   6
Total  14