Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 01 Jan 2019 |
Dep: | 01 Jan 2019 |
Arr: | 01 Jan 2019 |
Unload: | 01 Jan 2019 |
|
|
|
|
|
|
|
|
Jon Swallow
Standby Days
|
|
1/1
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Notes: New Year's Day |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 02 Jan 2019 |
Dep: | 02 Jan 2019 |
Arr: | 25 Jan 2019 |
Unload: | 25 Jan 2019 |
|
|
|
|
|
|
|
|
Jon Swallow
Overhaul or Repair
|
|
24/24
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Notes: Planned engine overhauls (in home port) |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 26 Jan 2019 |
Dep: | 26 Jan 2019 |
Arr: | 16 Apr 2019 |
Unload: | 16 Apr 2019 |
|
|
|
|
|
|
|
|
Jon Swallow
Available for Service
|
|
81/81
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Notes: Available for Service - unused days will be used for maintenance and outfitting and crew weekends off. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 17 Apr 2019 |
Dep: | 19 Apr 2019 |
Arr: | 26 Apr 2019 |
Unload: | 27 Apr 2019 |
|
|
|
|
|
|
|
|
Wayne R. Geyer
|
|
8/11
|
Clearances: NONE(T) |
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 28 Apr 2019 |
Dep: | 28 Apr 2019 |
Arr: | 28 Apr 2019 |
Unload: | 28 Apr 2019 |
|
|
|
|
|
|
|
|
Jon Swallow
Standby Days
|
|
1/1
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Notes: Weekend day in home port |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 29 Apr 2019 |
Dep: | 30 Apr 2019 |
Arr: | 08 May 2019 |
Unload: | 09 May 2019 |
|
|
|
|
|
|
|
|
Peter Mignerey
|
|
9/11
|
Clearances: NONE(T) |
|
|
|
Notes: Funded - direct from NRL unit |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 10 May 2019 |
Dep: | 10 May 2019 |
Arr: | 10 May 2019 |
Unload: | 10 May 2019 |
|
|
|
|
|
|
|
|
Jon Swallow
General Upkeep and Outfitting
|
|
1/1
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Notes: Upkeep and Outfitting day between cruises |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 11 May 2019 |
Dep: | 11 May 2019 |
Arr: | 12 May 2019 |
Unload: | 12 May 2019 |
|
|
|
|
|
|
|
|
Jon Swallow
Standby Days
|
|
2/2
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Notes: Weekend in home port |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 13 May 2019 |
Dep: | 13 May 2019 |
Arr: | 13 May 2019 |
Unload: | 13 May 2019 |
|
|
|
|
|
|
|
|
Jon Swallow
General Upkeep and Outfitting
|
|
1/1
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Notes: Upkeep and Outfitting day between cruises |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 14 May 2019 |
Dep: | 16 May 2019 |
Arr: | 12 Jun 2019 |
Unload: | 12 Jun 2019 |
|
|
|
|
Northeast Atl./ |
NA06 |
NA06 |
|
|
|
|
|
Nathan Keith
|
|
28/30
|
Clearances: Canada(T), NONE(T) |
Ancil Facs: Wet Lab Van |
|
|
|
Notes: Unload the following morning in WH then begin transit to Lewes. Offload other gear in Lewes 6/15. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 13 Jun 2019 |
Dep: | 13 Jun 2019 |
Arr: | 14 Jun 2019 |
Unload: | 15 Jun 2019 |
|
|
|
|
|
|
|
|
Nathan Keith
Transit Cruise
|
|
2/3
|
Clearances: NONE(T) |
Ancil Facs: Wet Lab Van |
|
|
|
Notes: Unload in WH the morning of 6/13 then transit to Lewes. Offload other gear and clean ship in Lewes 6/15. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 16 May 2019 |
Dep: | 16 Jun 2019 |
Arr: | 20 Jun 2019 |
Unload: | 20 Jun 2019 |
|
|
|
|
Northeast Atl./ |
NA06 |
NA06 |
|
|
|
|
|
Nathan Keith
|
|
5/5
|
Clearances: Canada(T), NONE(T) |
Ancil Facs: Wet Lab Van |
|
|
|
Notes: Pending extra days for HabCam operations |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 21 Jun 2019 |
Dep: | 21 Jun 2019 |
Arr: | 21 Jun 2019 |
Unload: | 21 Jun 2019 |
|
|
|
|
|
|
|
|
Jon Swallow
General Upkeep and Outfitting
|
|
1/1
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Notes: Upkeep and Outfitting day between cruises |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 22 Jun 2019 |
Dep: | 22 Jun 2019 |
Arr: | 22 Jun 2019 |
Unload: | 22 Jun 2019 |
|
|
|
|
|
|
|
|
Jon Swallow
Standby Days
|
|
1/1
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Notes: Weekend day in home port |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 23 Jun 2019 |
Dep: | 24 Jun 2019 |
Arr: | 28 Jun 2019 |
Unload: | 29 Jun 2019 |
|
|
|
|
|
|
|
|
Arthur Trembanis
|
|
5/7
|
Clearances: US EEZ(T) |
Ancil Facs: AUV Lab Van #1 |
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 30 Jun 2019 |
Dep: | 01 Jul 2019 |
Arr: | 03 Jul 2019 |
Unload: | 03 Jul 2019 |
|
|
|
|
Ocean City, MD/ |
NA06 |
NA06 |
|
|
|
|
|
Joe Calantoni
|
|
3/4
|
Clearances: NONE(T) |
|
|
|
Notes: dmob upon return 7/3 |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 04 Jul 2019 |
Dep: | 04 Jul 2019 |
Arr: | 07 Jul 2019 |
Unload: | 07 Jul 2019 |
|
|
|
|
|
|
|
|
Jon Swallow
Standby Days
|
|
4/4
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Notes: July 4th. Long weekend with ship alongside unless mission scheduled. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 08 Jul 2019 |
Dep: | 08 Jul 2019 |
Arr: | 04 Aug 2019 |
Unload: | 04 Aug 2019 |
|
|
|
|
|
|
|
|
Jon Swallow
Available for Service
|
|
28/28
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Notes: Available for Service - unused days will be used for maintenance and outfitting and crew weekends off. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 05 Aug 2019 |
Dep: | 05 Aug 2019 |
Arr: | 07 Aug 2019 |
Unload: | 08 Aug 2019 |
|
|
|
|
Ocean City, MD/ |
NA06 |
NA06 |
|
|
|
|
|
Joe Calantoni
|
|
3/4
|
Clearances: NONE(T) |
|
|
|
Notes: mob prior to departure 8/5 |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 09 Aug 2019 |
Dep: | 09 Aug 2019 |
Arr: | 15 Sep 2019 |
Unload: | 15 Sep 2019 |
|
|
|
|
|
|
|
|
Jon Swallow
Available for Service
|
|
38/38
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Notes: Available for Service - unused days will be used for maintenance and outfitting and crew weekends off. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 16 Sep 2019 |
Dep: | 17 Sep 2019 |
Arr: | 18 Sep 2019 |
Unload: | 19 Sep 2019 |
|
|
|
|
|
|
|
|
Jon Swallow
Inspection
|
|
4/4
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Notes: NSF inspection 9/17-18 + 1 day before and after.
A request to reschedule can be made to accommodate a science mission during this time frame. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 20 Sep 2019 |
Dep: | 20 Sep 2019 |
Arr: | 02 Oct 2019 |
Unload: | 02 Oct 2019 |
|
|
|
|
|
|
|
|
Jon Swallow
Available for Service
|
|
13/13
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Notes: Available for Service - unused days will be used for maintenance and outfitting and crew weekends off. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 03 Oct 2019 |
Dep: | 03 Oct 2019 |
Arr: | 06 Oct 2019 |
Unload: | 06 Oct 2019 |
|
|
|
|
|
|
|
|
Jon Swallow
Outreach
|
|
4/4
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Notes: University of Delaware "Coast Day" outreach and education event.
5,000+ visitors estimated annually. Ship is open for tours.
3 days prep + Sunday 10/6 event. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 07 Oct 2019 |
Dep: | 07 Oct 2019 |
Arr: | 10 Oct 2019 |
Unload: | 10 Oct 2019 |
|
|
|
|
|
|
|
|
Jon Swallow
Available for Service
|
|
4/4
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 11 Oct 2019 |
Dep: | 12 Oct 2019 |
Arr: | 13 Oct 2019 |
Unload: | 13 Oct 2019 |
|
|
|
|
|
|
|
|
John A. Collins
Transit Cruise
|
|
2/3
|
Clearances: NONE(T), US EEZ(T) |
Ancil Facs: Other AUV, Other Seismic/OBS Facility, AUV Lab Van #1, General Purpose Lab Van |
|
|
|
Notes: Transit Lewes to WH.
Load van, crane, fuel and stores 10/11 |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 14 Oct 2019 |
Dep: | 14 Oct 2019 |
Arr: | 18 Oct 2019 |
Unload: | 18 Oct 2019 |
|
|
|
|
|
|
|
|
John A. Collins
|
|
5/5
|
Clearances: NONE(T), US EEZ(T) |
Ancil Facs: Other AUV, Other Seismic/OBS Facility, AUV Lab Van #1, General Purpose Lab Van |
|
|
|
Notes: Includes mob in WH 10/14. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 19 Oct 2019 |
Dep: | 19 Oct 2019 |
Arr: | 20 Oct 2019 |
Unload: | 21 Oct 2019 |
|
|
|
|
|
|
|
|
John A. Collins
Transit Cruise
|
|
2/3
|
Clearances: NONE(T), US EEZ(T) |
Ancil Facs: Other AUV, Other Seismic/OBS Facility, AUV Lab Van #1, General Purpose Lab Van |
|
|
|
Notes: Begin transit from WH to Lewes when unload in WH complete on 10/19.
Unload van and crane etc. in Lewes 10/21. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 22 Oct 2019 |
Dep: | 22 Oct 2019 |
Arr: | 25 Oct 2019 |
Unload: | 25 Oct 2019 |
|
|
|
|
|
|
|
|
Jon Swallow
General Upkeep and Outfitting
|
|
4/4
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Notes: Upkeep and Outfitting |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 26 Oct 2019 |
Dep: | 26 Oct 2019 |
Arr: | 26 Nov 2019 |
Unload: | 26 Nov 2019 |
|
|
|
|
|
|
|
|
Jon Swallow
Overhaul or Repair
|
|
32/32
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Notes: Shipyard period TBD.
ABS major 5-year cycle. Includes 3 transit days. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 27 Nov 2019 |
Dep: | 27 Nov 2019 |
Arr: | 27 Nov 2019 |
Unload: | 27 Nov 2019 |
|
|
|
|
|
|
|
|
Jon Swallow
General Upkeep and Outfitting
|
|
1/1
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Notes: Upkeep and Outfitting |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 28 Nov 2019 |
Dep: | 28 Nov 2019 |
Arr: | 01 Dec 2019 |
Unload: | 01 Dec 2019 |
|
|
|
|
|
|
|
|
Jon Swallow
Standby Days
|
|
4/4
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Notes: Thanksgiving Break |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 02 Dec 2019 |
Dep: | 02 Dec 2019 |
Arr: | 20 Dec 2019 |
Unload: | 20 Dec 2019 |
|
|
|
|
|
|
|
|
Jon Swallow
General Upkeep and Outfitting
|
|
19/19
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Notes: Upkeep and Outfitting |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 21 Dec 2019 |
Dep: | 21 Dec 2019 |
Arr: | 31 Dec 2019 |
Unload: | 31 Dec 2019 |
|
|
|
|
|
|
|
|
Jon Swallow
Standby Days
|
|
11/11
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Notes: Christmas Break |
|
|
|