Optical Modem OBS
-
2019
-
Hugh R. Sharp
|
|
|
Project Title: |
MRI Development: Earthquake Monitoring Offshore with On-Demand Retrieval of High-Rate Seismic Data Using an Autonomous Underwater Vehicle and High-Speed Optical Telemetry |
Project Status: |
Submitted |
Principal Investigator: |
John A. Collins, WHOI |
Project Institution: |
WHOI |
Project ID: |
104684 |
Version #: |
7 |
Date Submitted: |
1/20/2015 7:03:00 PM |
Created By: |
John A. Collins |
Date Last Modified: |
8/23/2018 12:20:00 PM |
URI Serial #: |
None |
Funding Agencies: |
NSF/OCE/MGG - 1532035 - Funded |
Summary of Field Work: |
In 2019, we propose to deploy 2 OBS with optical modem in the vicinity of the OOI Pioneer Array. The OBS will be recovered in 2020. During both cruises, we will test data transfer, via an optical modem, between 2 OBS and a REMUS AUV. |
Summary of Facility Requirements: |
For both cruises, we need ship-mounted 12 kHz transducers and a CTD/ rosette. We need sufficient deck space for 2 OBS, a REMUS-600 AUV, and a 20' lab. van. For both cruises we need a crane/A-frame to handle the REMUS AUV and the 2 OBS. |
Summary of other requirements and comments: |
N/A |
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1007478 |
Created By: |
John A. Collins |
Date Last Modified: |
8/23/2018 12:20:00 PM |
Date Submitted: |
1/20/2015 7:03:00 PM |
|
Year: |
2019
|
Ship/Facility: |
Hugh R. Sharp
|
Optimum Start Date:
|
10/15/2019 |
Dates to Avoid: |
We have other cruises in August (AACSE recovery Leg 1 on Sikuliaq) and September (AACSE recovery Leg 2, Langseth) |
|
|
|
|
Earliest Start Date: |
10/1/2019 |
Multi-Ship Op: |
No |
Latest Start Date: |
11/1/2019 |
Other Ship(s): |
Not a multi-ship experiment, |
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
3 |
1 |
1 |
1 |
6 |
Repeating Cruise?
(within same year) |
No |
Interval: |
N/A |
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
Not a repeating cruise. |
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
Need at least an intermediate ship with adequate deck space for REMUS AUV and 2 OBS. Ideally, this experiment would piggyback on OOI cruise to Pioneer Array |
|
Short Description of Op Area
for use in schedules: |
Pioneer Array |
Description of Op Area: |
500 m water just south of Pioneer Arary |
Op Area Size/Dia.: |
10 x 10 |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
39° 30' N
/
70° 30' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
US EEZ |
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
Cruise will be in U.S. waters. |
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Woods Hole, MA, USA |
None, |
Woods Hole, MA, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
Requested ports will minimize transit time. |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
John A. Collins, WHOI |
# in Science Party |
5 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
Science party will consist of WHOI scientists, engineers, and technicians. We need a ship-tech to oversee deployments and recoveries. |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Fiber Optic (.681) | 0.680 Coax Wire | Diving |
Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe | 1 PI-Provided Vans - briefly describe |
MOCNESS | | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
We will deploy 2 OBS in passive mode only. No air gun shooting required.
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
2 OBS will be provided by WHOI |
|