Secure - ID #13781    Version #1 - 2/15/2019

Scheduling Contact(s)
Kerry Strom kstrom*%*%*whoi^%^%^edu (508) 289-3938

  Notes:   2/16: -1 day/ ONR from Alvin Eng Dive on Hansel
2/11: Changed DD dock from SFO to Vallejo
1/19/2019: Added 19d Valentine (2020) work in SD, B4 transiting Panama
1/9/2019: Removed Hueber's 7 days from Lang (not funded)
12/12: Add 2 Alvin Eng Dives onto Sylvan
& add 1 day to Ohman's 1st cruise for NOAA
10/12: Add 7 days to Lang (Huber & Rogers)
10/1: Add Drazen Alvin Cruise...Remove Resing (Sally Ride)...Add 2 days on Kelley's Pythias for Rob Harris.
9/28: Ref Email from UW: Take 10 charge days from Kelley's OOI & bill it to IPS
AND Corrected transit to Orcutt cruise from MGG to OOI d/t schedule changes
9/7: Ohman: 2 days of NOAA funding may be added to Spring cruise. TBC?
8/30: squeeze Hansel inbetween newport>SD transit.
8/21: change Jason eng dive from Kelley to Abers/ Sikuliaq and take 1 mobe day off Kelley OOI
8/3: Hansel can NOT go before Sept d/t an August cruise elsewhere & her instruments will not be ready until Sept. They are flexible in location and can go from Sept-Dec, no prob.
8/2: Lang in 2020, Hansel before Resing then Boettcher (using Manta, Equador)
7/17: This schedule delays the vessel from DD to start USWC Jason work later to give Jason a week to get from Charleston to Newport (provided Adams/ Brown goes in April)
6/27: "W" -3 days Rappe off Orcutt
6/25: Confirmed Resing can not work at EPR in OCT d/t wx
6/12: Add SSSG STR for Multibeam calibrations 2 days on a seamount/ deepwater
5/18: Orcutt:"The CORKs that are the primary target for my Jason cruise are at 2.6km water depth. We could do either Jason deployment mode - single body or double body. If my cruise is bracketed by OOI work, I imagine that single body might be the mode of choice to limit configuration changes? If single body, we would want to have the science tool sled instead of the heavy lift sled, since we will not have any heavy lift needs on my cruise."
5/14: Ohman needs mid June/ July for filament "spin up" and windfields (too still in Aug) Also needs berthing for 36 (no DSOG?)
3/30: Reimers on the Cabled array (not Endurance)
3/28: Sikuliaq will cover Ohman
3/26: Added 2nd Abers & Reimer
3/6: Orcutt "There is a good chance that I will be invited to participate in a IODP drilling expedition off Costa Rica within the same optimal time window for the JdF cruise (July-September 2019)."
2/8: Cohen "W" (-19 days)
1/31: Hansel can do late summer/ early fall near Caymans (flexible).
Out of DRY DOCK...? March/ April? (Al-TBD)
Funded STR's for Kelley (CA), Orcutt (OR) & Abers (AK) need to be covered
Remove 2 SWIFT cruises in the Indian Ocean (too far & no Alvin work)
Add Armstrong's: Chave, McGillicuddy & Fall Pioneer?
1/22: Young W (-22 days w/ Alvin Sentry) as per scientist
1/18/18: Karson W (-33 days w/ Sentry & Jason)
12/15/17: Resenbach W (-7days w/ Alvin)
  View Summary     Set Default Associated Cruises
Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Jan 2019
Dep:01 Jan 2019
Arr:09 Mar 2019
Unload:09 Mar 2019
 
Vallejo, California, USA
Vallejo, California, USA
 
None/
SA02
SA02
 
 
 
0N/0E
0N/0E
 
  Timothy Twomey
Overhaul or Repair
  68/68

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Dry-Dock/ 68 Not Specified 0/OTHER/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:10 Mar 2019
Dep:10 Mar 2019
Arr:10 Mar 2019
Unload:10 Mar 2019
 
San Francisco, CA, USA
San Francisco, CA, USA
 
None/
SA02
SA02
 
 
 
0N/0E
0N/0E
 
  Timothy Twomey
General Upkeep and Outfitting
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
1 Day Not Specified 0/OTHER/NonOp

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:11 Mar 2019
Dep:13 Mar 2019
Arr:22 Mar 2019
Unload:23 Mar 2019
 
San Francisco, CA, USA
San Francisco, CA, USA
 
Station M/
NP07A
NP07A
 
 
 
34N/126E
35N/123E
 
  Jeffrey C. Drazen
  10/13

Clearances: NONE(T), US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
Abyssal food web Jeffrey C. Drazen/UH_SOEST 1829612 10/NSF-OCE-BIO/F
ATL-MB&USBL calib Laura Stolp/WHOI Not Specified 2/NSF-OCE-IPS/F
Alvin Eng. Dive W. Bruce Strickrott/WHOI Not Specified 1/NAVY-ONR/F
Alvin Not Specified 0/OTHER/F
 
Notes: Drazen: SFO to Start= 275nm/ 10.5kts/ 24hrs =1.09 days Fnish to SFO= 190nm/ 10.5kts/ 24hrs =0.75 days + 1 day for dep & arr = 3 days

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:24 Mar 2019
Dep:26 Mar 2019
Arr:24 Apr 2019
Unload:25 Apr 2019
 
San Francisco, CA, USA
San Diego, CA, USA
 
EPR 9N/
NP13
NP13
 
 
 
10N/104W
10N/104W
 
  Jason B. Sylvan
  30/33

Clearances: Mexico(T)
 
Project PI/Institution Project # Days/Agency/Status
hot2coldVents Jason B. Sylvan/TAMU_CS 1756339 31/NSF-OCE-BIO/F
2019 Alvin Engineer W. Bruce Strickrott/WHOI Not Specified 2/NSF-OCE-IPS/T
2019 Alvin Engineer W. Bruce Strickrott/WHOI Not Specified 0/NAVY-ONR/T
Alvin Not Specified 0/OTHER/F
 
Notes: SFO to Davidson Seamount= 1 day transit (March 26th) 2 days of Dives (March 27 & 28) 8 days transit to 9N (March 29 - April 5) 12 Days of science (April 6 - 17) 7 days transit to SD (April 18 - 24)

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:26 Apr 2019
Dep:28 Apr 2019
Arr:04 May 2019
Unload:05 May 2019
 
San Diego, CA, USA
San Diego, CA, USA
 
Southern CA/
NP09
NP09
 
 
 
33N/117W
33N/117W
 
  Mark D. Ohman
  7/10

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
CCE-LTER III Mark D. Ohman/SIO 1637632 9/NSF-OCE-BIO/F
Uwe Send/SIO Not Specified 1/NOAA-OAR/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:06 May 2019
Dep:06 May 2019
Arr:10 May 2019
Unload:10 May 2019
 
San Diego, CA, USA
Newport, OR, USA
 
None/
SA02
SA02
 
 
 
0N/0E
0N/0E
 
  Timothy Twomey
Transit Cruise
  5/5

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Not Specified 3/NSF-OCE-BIO/F
Not Specified 2/NSF-OOI-OOI/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:11 May 2019
Dep:15 May 2019
Arr:28 May 2019
Unload:29 May 2019
 
Newport, OR, USA
Newport, OR, USA
 
Juan de Fuca/
NP09
NP09
 
 
 
47N/127W
47N/127W
 
  Beth Orcutt
  14/19

Clearances: Canada(T)
 
Project PI/Institution Project # Days/Agency/Status
Slow Life Beth Orcutt/Bigelow 1737017 18/NSF-OCE-BIO/F
2019 JASON Eng dives Matt Heintz/WHOI Not Specified 1/NSF-OCE-IPS/P

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:30 May 2019
Dep:02 Jun 2019
Arr:09 Jul 2019
Unload:12 Jul 2019
 
Newport, OR, USA
Newport, OR, USA
 
OR Margin-Axial/
NP09
NP09
 
 
 
49N/124W
46N/130W
 
  Deborah S. Kelley
  38/44

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
OOI Cabled Array Deborah S. Kelley/UW Not Specified 26/NSF-OOI-OOI/P
UW Days Not Specified 10/INST-UW/F
heat flow at ASHES Karen Bemis/Rutgers_IMCS Not Specified 3/NSF-OCE-MGG/F
Benthic Observer Pro Clare E. Reimers/OS N00014-16-1-2881 2/NAVY-ONR/F
A0A Pressure Axial William S. Wilcock/UW 1829486 1/NSF-OCE-OTIC/F
HTVE-UE Jeffrey Breedlove/Creare N68335-16-C-0383 1/NAVY-ONR/F
M3 MARUM Deborah S. Kelley/UW Not Specified 1/OTHER/F
heat flow at ASHES Karen Bemis/Rutgers_IMCS Not Specified 0/NSF-OCE-OTIC/F
Jason Not Specified 0/OTHER/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:13 Jul 2019
Dep:15 Jul 2019
Arr:26 Jul 2019
Unload:27 Jul 2019
 
Newport, OR, USA
Newport, OR, USA
 
Oregon/N. Calif/
NP09
NP09
 
 
 
45N/124W
45N/124W
 
  Robert Cowen
  12/15

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Meso-zoopl food webs Robert Cowen/OSU_HMSC 1737399 15/NSF-OCE-BIO/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:28 Jul 2019
Dep:28 Jul 2019
Arr:01 Aug 2019
Unload:01 Aug 2019
 
Newport, OR, USA
San Diego, CA, USA
 
None/
SA02
SA02
 
 
 
0N/0E
0N/0E
 
  Timothy Twomey
Transit Cruise
  5/5

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Not Specified 5/NSF-OCE-BIO/F
Stem-Seas Not Specified 0/OTHER/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:02 Aug 2019
Dep:05 Aug 2019
Arr:06 Sep 2019
Unload:08 Sep 2019
 
San Diego, CA, USA
San Diego, CA, USA
 
Southern CA/
NP09
NP09
 
 
 
33N/117W
33N/117W
 
  Mark D. Ohman
  33/38

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
CCE-LTER III Mark D. Ohman/SIO 1637632 38/NSF-OCE-BIO/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:09 Sep 2019
Dep:09 Sep 2019
Arr:13 Sep 2019
Unload:13 Sep 2019
 
San Diego, CA, USA
Newport, OR, USA
 
None/
SA02
SA02
 
 
 
0N/0E
0N/0E
 
  Timothy Twomey
Transit Cruise
  5/5

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Not Specified 3/NSF-OCE-MGG/F
Not Specified 2/NSF-OCE-OTIC/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:14 Sep 2019
Dep:18 Sep 2019
Arr:03 Oct 2019
Unload:05 Oct 2019
 
Newport, OR, USA
Newport, OR, USA
 
Cascadia Margin/
NP09
NP09
 
 
 
44N/125W
44N/125W
 
  Deborah S. Kelley
  16/22

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Pythia's Oasis Deborah S. Kelley/UW 1658201 19/NSF-OCE-MGG/F
Heat flow at Pythias Robert N. Harris/OSU_COAS 1902446 2/NSF-OCE-MGG/P
Sentry Engineering Sean Kelley/WHOI Not Specified 1/NSF-OCE-IPS/P
Sentry & Jason Not Specified 0/OTHER/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:06 Oct 2019
Dep:08 Oct 2019
Arr:23 Oct 2019
Unload:24 Oct 2019
 
Newport, OR, USA
San Diego, CA, USA
 
None/
SA02
SA02
 
 
 
0N/0E
0N/0E
 
  Colleen Hansel
  16/19

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
SOLARIS Colleen Hansel/WHOI 1736332 14/NSF-OCE-OTIC/F
Sentry Engineering Sean Kelley/WHOI Not Specified 3/NSF-OCE-IPS/P
2019 Alvin Engineer W. Bruce Strickrott/WHOI Not Specified 2/NSF-OCE-IPS/T
2019 Alvin Engineer W. Bruce Strickrott/WHOI Not Specified 0/NAVY-ONR/T
Alvin Not Specified 0/OTHER/F
 
Notes: Newport to Monterey- Alvin/ Sentry Engineering cruise 6 days (8-13th). Launch VIP's to ship in Monterey for 1 dive Mobe Hansel in Newport and launch science party on in Monterey TBD. Sentry can stay on board .

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:25 Oct 2019
Dep:29 Oct 2019
Arr:10 Nov 2019
Unload:12 Nov 2019
 
San Diego, CA, USA
San Diego, CA, USA
 
So Cal/
NP09
NP09
 
 
 
34N/120W
34N/120W
 
  David L. Valentine
  13/19

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
BASIN Project David L. Valentine/UCSB Not Specified 10/NSF-OCE-BIO/F
BASIN Project David L. Valentine/UCSB 1829981 9/NSF-OCE-CO/F
Sentry & Jason Not Specified 0/OTHER/P

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:13 Nov 2019
Dep:16 Nov 2019
Arr:14 Dec 2019
Unload:17 Dec 2019
 
San Diego, CA, USA
Balboa, Panama
 
Gofar TF, EPR/
NP13
NP13
 
 
 
5N/106W
4N/106W
 
  Margaret Boettcher
  29/35

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Gofar TF Earthquakes Margaret Boettcher/UNH 1832830 35/NSF-OCE-MGG/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:18 Dec 2019
Dep:22 Dec 2019
Arr:29 Dec 2019
Unload:31 Dec 2019
 
Balboa, Panama
St. Petersburg, FL, USA
 
Cayman/
NA09
NA09
 
 
 
18N/82W
19N/82W
 
  Jeffrey Seewald
  8/14

Clearances: Cayman Islands(T)
 
Project PI/Institution Project # Days/Agency/Status
Carbon at Cayman Susan Lang/SC 1801036 11/NSF-OCE-MGG/F
Cayman DEEP Karyn Rogers/RPI 16-PSTAR16-0056 3/NASA/T
Jason Not Specified 0/OTHER/F
Agency   Funded   Pending   Total
INST   10   0   10
NASA   0   3   3
NAVY   4   0   4
NOAA   1   0   1
NSF   238   11   249
NSF-OOI   2   26   28
OTHER   1   0   1
Total  256 40 296
<
Day Type   Total
Transit Cruise   15
General Upkeep and Outfitting   1
Overhaul or Repair   68
At Sea for Science   226
Total  310
<
Load/Unload Days   Total
ChargeLoad   35
ChargeUnload   20
Total  55