Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 01 Jan 2019 |
Dep: | 01 Jan 2019 |
Arr: | 08 Jan 2019 |
Unload: | 08 Jan 2019 |
|
|
|
|
|
|
|
|
Stephen Z. Kelety
Overhaul or Repair
|
|
8/8
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Notes: Marine Group Chula Vista |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 09 Jan 2019 |
Dep: | 09 Jan 2019 |
Arr: | 18 Jan 2019 |
Unload: | 18 Jan 2019 |
|
|
|
|
|
|
|
|
Stephen Z. Kelety
Overhaul or Repair
|
|
10/10
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 19 Jan 2019 |
Dep: | 19 Jan 2019 |
Arr: | 24 Feb 2019 |
Unload: | 24 Feb 2019 |
|
|
|
|
|
|
|
|
Bruce Appelgate
Available for Service
|
|
37/37
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 25 Feb 2019 |
Dep: | 26 Feb 2019 |
Arr: | 26 Feb 2019 |
Unload: | 26 Feb 2019 |
|
|
|
|
|
|
|
|
Shannon Scott
|
|
1/2
|
Clearances: NONE(T) |
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 27 Feb 2019 |
Dep: | 27 Feb 2019 |
Arr: | 06 Mar 2019 |
Unload: | 06 Mar 2019 |
|
|
|
|
|
|
|
|
Bruce Appelgate
Available for Service
|
|
8/8
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 07 Mar 2019 |
Dep: | 07 Mar 2019 |
Arr: | 07 Mar 2019 |
Unload: | 07 Mar 2019 |
|
|
|
|
|
|
|
|
Peyton Hall
|
|
1/1
|
Clearances: NONE(T) |
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 08 Mar 2019 |
Dep: | 09 Mar 2019 |
Arr: | 09 Mar 2019 |
Unload: | 09 Mar 2019 |
|
|
|
|
|
|
|
|
Phil Zerofski
|
|
1/2
|
Clearances: NONE(T) |
|
|
|
Notes: (mid-February to early
March) SIO 188/294 |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 10 Mar 2019 |
Dep: | 10 Mar 2019 |
Arr: | 11 Mar 2019 |
Unload: | 11 Mar 2019 |
|
|
|
|
|
|
|
|
Bruce Appelgate
Standby Days
|
|
2/2
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 12 Mar 2019 |
Dep: | 12 Mar 2019 |
Arr: | 12 Mar 2019 |
Unload: | 12 Mar 2019 |
|
|
|
|
|
|
|
|
Peyton Hall
|
|
1/1
|
Clearances: NONE(T) |
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 13 Mar 2019 |
Dep: | 13 Mar 2019 |
Arr: | 25 Apr 2019 |
Unload: | 25 Apr 2019 |
|
|
|
|
|
|
|
|
Bruce Appelgate
Available for Service
|
|
44/44
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Notes: March 29th is a UC Holiday. April 21 is Easter. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 26 Apr 2019 |
Dep: | 27 Apr 2019 |
Arr: | 27 Apr 2019 |
Unload: | 27 Apr 2019 |
|
|
|
|
San Diego Troug/ |
NP09 |
NP09 |
|
|
|
|
|
Jennifer Taylor
|
|
1/2
|
Clearances: NONE(T) |
|
|
|
Notes: Spring quarter |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 28 Apr 2019 |
Dep: | 28 Apr 2019 |
Arr: | 29 Apr 2019 |
Unload: | 29 Apr 2019 |
|
|
|
|
|
|
|
|
Bruce Appelgate
Standby Days
|
|
2/2
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 30 Apr 2019 |
Dep: | 01 May 2019 |
Arr: | 01 May 2019 |
Unload: | 02 May 2019 |
|
|
|
|
|
|
|
|
Paul R. Jensen
|
|
1/3
|
Clearances: US EEZ(T) |
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 03 May 2019 |
Dep: | 04 May 2019 |
Arr: | 08 May 2019 |
Unload: | 09 May 2019 |
|
|
|
|
|
|
|
|
K. Ashlyn A. Giddings
|
|
4/7
|
Clearances: NONE(T) |
|
|
|
Notes: R/V Robert G. Sproul operates on a 24 hour day, therefore
sea days and charge days (Op days) may not be the same. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 10 May 2019 |
Dep: | 11 May 2019 |
Arr: | 11 May 2019 |
Unload: | 11 May 2019 |
|
|
|
|
|
|
|
|
Greg Rouse
|
|
1/2
|
Clearances: NONE(T) |
|
|
|
Notes: Student Cruise for SIO 184 (Marine Invertebrates), Spring 2019. the weekends in April or May are ideal |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 12 May 2019 |
Dep: | 12 May 2019 |
Arr: | 12 May 2019 |
Unload: | 13 May 2019 |
|
|
|
|
|
|
|
|
Greg Rouse
|
|
1/2
|
Clearances: NONE(T) |
|
|
|
Notes: Student Cruise for SIO 184 (Marine Invertebrates), Spring 2019. the weekends in April or May are ideal |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 14 May 2019 |
Dep: | 14 May 2019 |
Arr: | 16 May 2019 |
Unload: | 16 May 2019 |
|
|
|
|
|
|
|
|
Bruce Appelgate
Available for Service
|
|
3/3
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 17 May 2019 |
Dep: | 18 May 2019 |
Arr: | 18 May 2019 |
Unload: | 19 May 2019 |
|
|
|
|
|
|
|
|
Mark A. Merrifield
|
|
1/3
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
MAS Climate Science
|
Mark A. Merrifield/SIO
|
Not Specified
|
3/INST-UCSD-SIO/F
|
|
|
Notes: Spring Quarter |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 20 May 2019 |
Dep: | 20 May 2019 |
Arr: | 18 Jun 2019 |
Unload: | 18 Jun 2019 |
|
|
|
|
|
|
|
|
Bruce Appelgate
Available for Service
|
|
30/30
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Notes: 27 May is Memorial Day holiday |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 19 Jun 2019 |
Dep: | 19 Jun 2019 |
Arr: | 20 Jun 2019 |
Unload: | 20 Jun 2019 |
|
|
|
|
|
|
|
|
Bruce Appelgate
Inspection
|
|
2/2
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Notes: Pending NSF approval |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 21 Jun 2019 |
Dep: | 21 Jun 2019 |
Arr: | 11 Jul 2019 |
Unload: | 11 Jul 2019 |
|
|
|
|
|
|
|
|
Bruce Appelgate
Available for Service
|
|
21/21
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 12 Jul 2019 |
Dep: | 13 Jul 2019 |
Arr: | 13 Jul 2019 |
Unload: | 13 Jul 2019 |
|
|
|
|
|
|
|
|
Greg Rouse
|
|
1/2
|
Clearances: NONE(T) |
|
|
|
Notes: Weekends of July 13 & 14 or July
20-21. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 14 Jul 2019 |
Dep: | 14 Jul 2019 |
Arr: | 14 Jul 2019 |
Unload: | 15 Jul 2019 |
|
|
|
|
|
|
|
|
Greg Rouse
|
|
1/2
|
Clearances: NONE(T) |
|
|
|
Notes: Weekends of July 13 & 14 or July
20-21. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 16 Jul 2019 |
Dep: | 16 Jul 2019 |
Arr: | 18 Aug 2019 |
Unload: | 18 Aug 2019 |
|
|
|
|
|
|
|
|
Bruce Appelgate
Available for Service
|
|
34/34
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Notes: Friday 18 August reserved for Rouse load out. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 19 Aug 2019 |
Dep: | 19 Aug 2019 |
Arr: | 21 Aug 2019 |
Unload: | 22 Aug 2019 |
|
|
|
|
|
|
|
|
Greg Rouse
|
|
3/4
|
Clearances: NONE(T) |
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 23 Aug 2019 |
Dep: | 23 Aug 2019 |
Arr: | 08 Sep 2019 |
Unload: | 08 Sep 2019 |
|
|
|
|
|
|
|
|
Bruce Appelgate
Available for Service
|
|
17/17
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Notes: 2 September is Labor Day holiday |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 09 Sep 2019 |
Dep: | 10 Sep 2019 |
Arr: | 14 Sep 2019 |
Unload: | 15 Sep 2019 |
|
|
|
|
|
|
|
|
Matthew H. Alford
|
|
5/7
|
Clearances: NONE(T) |
|
|
|
Notes: R/V Robert G. Sproul operates on a 24 hour day, therefore
sea days and charge days (Op days) may not be the same.
Combined the two two-day cruises into one 4 sea, 2 port. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 16 Sep 2019 |
Dep: | 18 Sep 2019 |
Arr: | 28 Sep 2019 |
Unload: | 29 Sep 2019 |
|
|
|
|
SCORE ASW area/ |
NP09 |
NP09 |
|
|
|
|
|
Rebecca W. Henley
|
|
11/14
|
Clearances: NONE(T) |
|
|
|
Notes: This project is under a 3 year contract. DARPA-Raytheon-GD
Criuse details including equipment details to follow.
Will need a purchase order to charge. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 30 Sep 2019 |
Dep: | 30 Sep 2019 |
Arr: | 03 Oct 2019 |
Unload: | 03 Oct 2019 |
|
|
|
|
|
|
|
|
Bruce Appelgate
Available for Service
|
|
4/4
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 04 Oct 2019 |
Dep: | 05 Oct 2019 |
Arr: | 06 Oct 2019 |
Unload: | 07 Oct 2019 |
|
|
|
|
USD series site/ |
NP09 |
NP09 |
|
|
|
|
|
Sarah Gray
|
|
2/4
|
Clearances: NONE(T) |
|
|
|
Notes: SIO would like to request two days for this operation. The model (3-8hour cruises with 30 participants on each cruise in a 24 hour period.) proposed by Dr. Gray is taxing to the Sproul crew and the technicians. We propose 2 sea days for the operation in addition to load and offload days. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 08 Oct 2019 |
Dep: | 08 Oct 2019 |
Arr: | 10 Oct 2019 |
Unload: | 10 Oct 2019 |
|
|
|
|
|
|
|
|
Bruce Appelgate
Available for Service
|
|
3/3
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 11 Oct 2019 |
Dep: | 12 Oct 2019 |
Arr: | 12 Oct 2019 |
Unload: | 12 Oct 2019 |
|
|
|
|
San Diego Coast/ |
NP09 |
NP09 |
|
|
|
|
|
Simone Baumann-Pickering
|
|
1/2
|
Clearances: NONE(T) |
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 13 Oct 2019 |
Dep: | 13 Oct 2019 |
Arr: | 13 Oct 2019 |
Unload: | 14 Oct 2019 |
|
|
|
|
San Diego Coast/ |
NP09 |
NP09 |
|
|
|
|
|
Simone Baumann-Pickering
|
|
1/2
|
Clearances: NONE(T) |
|
|
|
Notes: 11 November is a holiday |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 15 Oct 2019 |
Dep: | 15 Oct 2019 |
Arr: | 17 Oct 2019 |
Unload: | 17 Oct 2019 |
|
|
|
|
|
|
|
|
Bruce Appelgate
Available for Service
|
|
3/3
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 18 Oct 2019 |
Dep: | 19 Oct 2019 |
Arr: | 19 Oct 2019 |
Unload: | 20 Oct 2019 |
|
|
|
|
So. Cal. Bight/ |
NP09 |
NP09 |
|
|
|
|
|
Lisa A. Levin
|
|
1/3
|
Clearances: NONE(T) |
|
|
|
Notes: unload on a Monday |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 21 Oct 2019 |
Dep: | 22 Oct 2019 |
Arr: | 23 Oct 2019 |
Unload: | 24 Oct 2019 |
|
|
|
|
|
|
|
|
Jennifer A. MacKinnon
|
|
2/4
|
Clearances: NONE(T) |
|
|
|
Notes: Award has been received, the project is funded. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 25 Oct 2019 |
Dep: | 26 Oct 2019 |
Arr: | 26 Oct 2019 |
Unload: | 27 Oct 2019 |
|
|
|
|
San Diego Coast/ |
NP09 |
NP09 |
|
|
|
|
|
Simone Baumann-Pickering
|
|
1/3
|
Clearances: NONE(T) |
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 28 Oct 2019 |
Dep: | 28 Oct 2019 |
Arr: | 31 Oct 2019 |
Unload: | 31 Oct 2019 |
|
|
|
|
|
|
|
|
Bruce Appelgate
Available for Service
|
|
4/4
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 01 Nov 2019 |
Dep: | 02 Nov 2019 |
Arr: | 02 Nov 2019 |
Unload: | 04 Nov 2019 |
|
|
|
|
So. Cal. Bight/ |
NP09 |
NP09 |
|
|
|
|
|
Lisa A. Levin
|
|
1/4
|
Clearances: NONE(T) |
|
|
|
Notes: Unload on Monday |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 05 Nov 2019 |
Dep: | 06 Nov 2019 |
Arr: | 07 Nov 2019 |
Unload: | 08 Nov 2019 |
|
|
|
|
|
|
|
|
Matthew H. Alford
|
|
2/4
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Not Specified
|
4/NSF-OCE-PO/P
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 09 Nov 2019 |
Dep: | 09 Nov 2019 |
Arr: | 10 Nov 2019 |
Unload: | 10 Nov 2019 |
|
|
|
|
|
|
|
|
Bruce Appelgate
Available for Service
|
|
2/2
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 11 Nov 2019 |
Dep: | 11 Nov 2019 |
Arr: | 11 Nov 2019 |
Unload: | 11 Nov 2019 |
|
|
|
|
|
|
|
|
Bruce Appelgate
Standby Days
|
|
1/1
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Notes: Veterans day. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 12 Nov 2019 |
Dep: | 12 Nov 2019 |
Arr: | 21 Nov 2019 |
Unload: | 21 Nov 2019 |
|
|
|
|
|
|
|
|
Bruce Appelgate
Available for Service
|
|
10/10
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 22 Nov 2019 |
Dep: | 23 Nov 2019 |
Arr: | 23 Nov 2019 |
Unload: | 23 Nov 2019 |
|
|
|
|
|
|
|
|
Andrew J. Lucas
|
|
1/2
|
Clearances: US EEZ(T) |
|
|
|
Notes: 2 one days cruises in November.
(Preferred: weekends of 15, 22, 29 November, 2019). |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 24 Nov 2019 |
Dep: | 24 Nov 2019 |
Arr: | 24 Nov 2019 |
Unload: | 25 Nov 2019 |
|
|
|
|
|
|
|
|
Andrew J. Lucas
|
|
1/2
|
Clearances: US EEZ(T) |
|
|
|
Notes: 2 one days cruises in November.
(Preferred: weekends of 15, 22, 29 November, 2019). |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 26 Nov 2019 |
Dep: | 26 Nov 2019 |
Arr: | 27 Nov 2019 |
Unload: | 27 Nov 2019 |
|
|
|
|
|
|
|
|
Bruce Appelgate
Available for Service
|
|
2/2
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 28 Nov 2019 |
Dep: | 28 Nov 2019 |
Arr: | 01 Dec 2019 |
Unload: | 01 Dec 2019 |
|
|
|
|
|
|
|
|
Bruce Appelgate
Standby Days
|
|
4/4
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 02 Dec 2019 |
Dep: | 03 Dec 2019 |
Arr: | 07 Dec 2019 |
Unload: | 08 Dec 2019 |
|
|
|
|
|
|
|
|
Ana Širovic
|
|
5/7
|
Clearances: US EEZ(T) |
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 09 Dec 2019 |
Dep: | 09 Dec 2019 |
Arr: | 31 Dec 2019 |
Unload: | 31 Dec 2019 |
|
|
|
|
|
|
|
|
Bruce Appelgate
Available for Service
|
|
23/23
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | TBD |
Dep: | TBD |
Arr: | TBD |
Unload: | TBD |
|
|
|
|
|
|
|
|
Peter J. Franks
|
|
2/2
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
SIO280
|
|
Not Specified
|
2/INST-UCSD-SIO/F
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | TBD |
Dep: | TBD |
Arr: | TBD |
Unload: | TBD |
|
|
|
|
|
|
|
|
Eric Terrill
|
|
4/6
|
Clearances: NONE(T) |
|
|
|
|
|