|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 01 Jan 2019 |
Dep: | 01 Jan 2019 |
Arr: | 06 Jan 2019 |
Unload: | 06 Jan 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
Standby Days
|
|
6/6
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 07 Jan 2019 |
Dep: | 07 Jan 2019 |
Arr: | 07 Jan 2019 |
Unload: | 07 Jan 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
General Upkeep and Outfitting
|
|
1/1
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 08 Jan 2019 |
Dep: | 08 Jan 2019 |
Arr: | 14 Jan 2019 |
Unload: | 14 Jan 2019 |
|
|
|
|
|
|
|
|
Marcus Ogle
|
|
7/7
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
mooring maintenance
|
Marcus Ogle/FGEOS
|
Not Specified
|
7/OTHER/F
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 15 Jan 2019 |
Dep: | 15 Jan 2019 |
Arr: | 18 Jan 2019 |
Unload: | 18 Jan 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
General Upkeep and Outfitting
|
|
4/4
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 19 Jan 2019 |
Dep: | 19 Jan 2019 |
Arr: | 20 Jan 2019 |
Unload: | 20 Jan 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
Standby Days
|
|
2/2
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 21 Jan 2019 |
Dep: | 21 Jan 2019 |
Arr: | 25 Jan 2019 |
Unload: | 25 Jan 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
General Upkeep and Outfitting
|
|
5/5
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 26 Jan 2019 |
Dep: | 26 Jan 2019 |
Arr: | 27 Jan 2019 |
Unload: | 27 Jan 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
Standby Days
|
|
2/2
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 28 Jan 2019 |
Dep: | 28 Jan 2019 |
Arr: | 01 Feb 2019 |
Unload: | 01 Feb 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
General Upkeep and Outfitting
|
|
5/5
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 01 Feb 2019 |
Dep: | 01 Feb 2019 |
Arr: | 10 Feb 2019 |
Unload: | 10 Feb 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
General Upkeep and Outfitting
|
|
10/10
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 10 Feb 2019 |
Dep: | 12 Feb 2019 |
Arr: | 23 Feb 2019 |
Unload: | 24 Feb 2019 |
|
|
|
|
|
|
|
|
Craig R. McClain
|
|
12/15
|
Clearances: NONE(T) |
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 25 Feb 2019 |
Dep: | 25 Feb 2019 |
Arr: | 26 Feb 2019 |
Unload: | 26 Feb 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
General Upkeep and Outfitting
|
|
2/2
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 27 Feb 2019 |
Dep: | 27 Feb 2019 |
Arr: | 28 Feb 2019 |
Unload: | 28 Feb 2019 |
|
|
|
|
|
|
|
|
Caitlin Reynolds
|
|
2/2
|
Clearances: NONE(T) |
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 01 Mar 2019 |
Dep: | 01 Mar 2019 |
Arr: | 01 Mar 2019 |
Unload: | 01 Mar 2019 |
|
|
|
|
|
|
|
|
Chunyan Li
|
|
1/1
|
Clearances: NONE(T) |
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 02 Mar 2019 |
Dep: | 02 Mar 2019 |
Arr: | 05 Mar 2019 |
Unload: | 05 Mar 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
General Upkeep and Outfitting
|
|
4/4
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 06 Mar 2019 |
Dep: | 07 Mar 2019 |
Arr: | 12 Mar 2019 |
Unload: | 13 Mar 2019 |
|
|
|
|
|
|
|
|
Paula Perez-Brunius
|
|
6/8
|
Clearances: Mexico(S) |
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 14 Mar 2019 |
Dep: | 14 Mar 2019 |
Arr: | 04 Apr 2019 |
Unload: | 04 Apr 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
Overhaul or Repair
|
|
22/22
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 05 Apr 2019 |
Dep: | 05 Apr 2019 |
Arr: | 05 Apr 2019 |
Unload: | 05 Apr 2019 |
|
|
|
|
|
|
|
|
Chunyan Li
|
|
1/1
|
Clearances: NONE(T) |
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 06 Apr 2019 |
Dep: | 06 Apr 2019 |
Arr: | 06 Apr 2019 |
Unload: | 06 Apr 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
General Upkeep and Outfitting
|
|
1/1
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 07 Apr 2019 |
Dep: | 07 Apr 2019 |
Arr: | 10 Apr 2019 |
Unload: | 10 Apr 2019 |
|
|
|
|
|
|
|
|
Sean Griffin
|
|
4/4
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
ASV testing
|
Sean Griffin/PTL
|
Not Specified
|
4/OTHER/F
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 11 Apr 2019 |
Dep: | 13 Apr 2019 |
Arr: | 24 Apr 2019 |
Unload: | 25 Apr 2019 |
|
|
|
|
|
|
|
|
Craig R. McClain
|
|
12/15
|
Clearances: NONE(T) |
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 26 Apr 2019 |
Dep: | 26 Apr 2019 |
Arr: | 12 May 2019 |
Unload: | 12 May 2019 |
|
|
|
|
|
|
|
|
Santiago Herrera
|
|
17/17
|
Clearances: NONE(T) |
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 13 May 2019 |
Dep: | 14 May 2019 |
Arr: | 22 May 2019 |
Unload: | 23 May 2019 |
|
|
|
|
|
|
|
|
Suzanne L. Fredericq
|
|
9/11
|
Clearances: NONE(T) |
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 24 May 2019 |
Dep: | 24 May 2019 |
Arr: | 11 Jun 2019 |
Unload: | 11 Jun 2019 |
|
|
|
|
|
|
|
|
Robert K. Shearman
|
|
19/19
|
Clearances: NONE(T) |
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 12 Jun 2019 |
Dep: | 13 Jun 2019 |
Arr: | 28 Jun 2019 |
Unload: | 28 Jun 2019 |
|
|
|
|
|
|
|
|
Kathleen Donohue
|
|
16/17
|
Clearances: Mexico(T) |
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 29 Jun 2019 |
Dep: | 29 Jun 2019 |
Arr: | 29 Jun 2019 |
Unload: | 29 Jun 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
General Upkeep and Outfitting
|
|
1/1
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 30 Jun 2019 |
Dep: | 30 Jun 2019 |
Arr: | 02 Jul 2019 |
Unload: | 02 Jul 2019 |
|
|
|
|
|
|
|
|
Chloe Dean
|
|
3/3
|
Clearances: NONE(T) |
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 03 Jul 2019 |
Dep: | 03 Jul 2019 |
Arr: | 07 Jul 2019 |
Unload: | 07 Jul 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
Standby Days
|
|
5/5
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 08 Jul 2019 |
Dep: | 08 Jul 2019 |
Arr: | 13 Jul 2019 |
Unload: | 13 Jul 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
General Upkeep and Outfitting
|
|
6/6
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 14 Jul 2019 |
Dep: | 15 Jul 2019 |
Arr: | 21 Jul 2019 |
Unload: | 22 Jul 2019 |
|
|
|
|
|
|
|
|
Kanchan Maiti
|
|
7/9
|
Clearances: NONE(T) |
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 23 Jul 2019 |
Dep: | 23 Jul 2019 |
Arr: | 30 Jul 2019 |
Unload: | 30 Jul 2019 |
|
|
|
|
|
|
|
|
Nancy N. Rabalais
|
|
8/8
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
Hypoxia research
|
Nancy N. Rabalais/LUMCON
|
Not Specified
|
8/INST-LUMCON/F
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 31 Jul 2019 |
Dep: | 01 Aug 2019 |
Arr: | 08 Aug 2019 |
Unload: | 09 Aug 2019 |
|
|
|
|
|
|
|
|
Greg Stunz
|
|
8/10
|
Clearances: NONE(T) |
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 10 Aug 2019 |
Dep: | 10 Aug 2019 |
Arr: | 10 Aug 2019 |
Unload: | 10 Aug 2019 |
|
|
|
|
|
|
|
|
Chunyan Li
|
|
1/1
|
Clearances: NONE(T) |
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 11 Aug 2019 |
Dep: | 11 Aug 2019 |
Arr: | 16 Aug 2019 |
Unload: | 16 Aug 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
General Upkeep and Outfitting
|
|
6/6
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 17 Aug 2019 |
Dep: | 17 Aug 2019 |
Arr: | 18 Aug 2019 |
Unload: | 18 Aug 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
Standby Days
|
|
2/2
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 19 Aug 2019 |
Dep: | 19 Aug 2019 |
Arr: | 23 Aug 2019 |
Unload: | 23 Aug 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
General Upkeep and Outfitting
|
|
5/5
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 24 Aug 2019 |
Dep: | 24 Aug 2019 |
Arr: | 25 Aug 2019 |
Unload: | 25 Aug 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
Standby Days
|
|
2/2
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 26 Aug 2019 |
Dep: | 26 Aug 2019 |
Arr: | 30 Aug 2019 |
Unload: | 30 Aug 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
General Upkeep and Outfitting
|
|
5/5
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 31 Aug 2019 |
Dep: | 31 Aug 2019 |
Arr: | 02 Sep 2019 |
Unload: | 02 Sep 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
Standby Days
|
|
3/3
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 03 Sep 2019 |
Dep: | 03 Sep 2019 |
Arr: | 06 Sep 2019 |
Unload: | 06 Sep 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
Overhaul or Repair
|
|
4/4
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 09 Sep 2019 |
Dep: | 09 Sep 2019 |
Arr: | 13 Sep 2019 |
Unload: | 13 Sep 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
Overhaul or Repair
|
|
5/5
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 14 Sep 2019 |
Dep: | 14 Sep 2019 |
Arr: | 15 Sep 2019 |
Unload: | 15 Sep 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
Standby Days
|
|
2/2
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 16 Sep 2019 |
Dep: | 16 Sep 2019 |
Arr: | 19 Sep 2019 |
Unload: | 19 Sep 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
Overhaul or Repair
|
|
4/4
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 20 Sep 2019 |
Dep: | 21 Sep 2019 |
Arr: | 07 Oct 2019 |
Unload: | 08 Oct 2019 |
|
|
|
|
|
|
|
|
Kathleen Donohue
|
|
17/19
|
Clearances: NONE(S) |
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 09 Oct 2019 |
Dep: | 09 Oct 2019 |
Arr: | 10 Oct 2019 |
Unload: | 10 Oct 2019 |
|
|
|
|
|
|
|
|
Chloe Dean
|
|
2/2
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
SEAMAP
|
Chloe Dean/LDWF
|
Not Specified
|
2/NOAA/F
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 11 Oct 2019 |
Dep: | 11 Oct 2019 |
Arr: | 11 Oct 2019 |
Unload: | 11 Oct 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
General Upkeep and Outfitting
|
|
1/1
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 12 Oct 2019 |
Dep: | 13 Oct 2019 |
Arr: | 17 Oct 2019 |
Unload: | 18 Oct 2019 |
|
|
|
|
|
|
|
|
Henry Potter
|
|
5/7
|
Clearances: NONE(T) |
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 19 Oct 2019 |
Dep: | 19 Oct 2019 |
Arr: | 19 Oct 2019 |
Unload: | 19 Oct 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
General Upkeep and Outfitting
|
|
1/1
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 20 Oct 2019 |
Dep: | 20 Oct 2019 |
Arr: | 02 Nov 2019 |
Unload: | 02 Nov 2019 |
|
|
|
|
|
|
|
|
Marcus Ogle
|
|
14/14
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
mooring maintenance
|
Marcus Ogle/FGEOS
|
Not Specified
|
14/OTHER/F
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 03 Nov 2019 |
Dep: | 03 Nov 2019 |
Arr: | 03 Nov 2019 |
Unload: | 03 Nov 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
General Upkeep and Outfitting
|
|
1/1
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 04 Nov 2019 |
Dep: | 04 Nov 2019 |
Arr: | 12 Nov 2019 |
Unload: | 12 Nov 2019 |
|
|
|
|
|
|
|
|
Sean Griffin
|
|
9/9
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
ASV testing
|
Sean Griffin/PTL
|
Not Specified
|
9/OTHER/F
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 13 Nov 2019 |
Dep: | 13 Nov 2019 |
Arr: | 18 Nov 2019 |
Unload: | 18 Nov 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
General Upkeep and Outfitting
|
|
6/6
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 21 Nov 2019 |
Dep: | 21 Nov 2019 |
Arr: | 30 Nov 2019 |
Unload: | 30 Nov 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
Standby Days
|
|
10/10
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 01 Dec 2019 |
Dep: | 01 Dec 2019 |
Arr: | 18 Dec 2019 |
Unload: | 18 Dec 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
Available for Service
|
|
18/18
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 17 Dec 2019 |
Dep: | 17 Dec 2019 |
Arr: | 18 Dec 2019 |
Unload: | 18 Dec 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
Inspection
|
|
2/2
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 19 Dec 2019 |
Dep: | 19 Dec 2019 |
Arr: | 19 Dec 2019 |
Unload: | 19 Dec 2019 |
|
|
|
|
|
|
|
|
Chunyan Li
|
|
1/1
|
Clearances: NONE(T) |
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 20 Dec 2019 |
Dep: | 20 Dec 2019 |
Arr: | 31 Dec 2019 |
Unload: | 31 Dec 2019 |
|
|
|
|
|
|
|
|
Joseph D. Malbrough
Standby Days
|
|
12/12
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|